StockPurchasing & receiving

Purchasing & receiving

Reorder suggestions → buyer-approved POs → goods receipt & QC → 3-way match. Tradex never commits to a supplier automatically.

How purchasing works

Every purchase moves through these steps, from “we are running low” to “the supplier is paid”. Click a step to see the work waiting at it.

Short deliveries stay open on the PO as a backorder until they arrive or are cancelled (). Failed or wrong units go back to the supplier: Returns to suppliers.Order by hand: · lead times and scores:
Open POs
14
₹38.6 L ex-GST
Awaiting approval
3
1 needs owner (> ₹5 L)
Due this week
6
1 overdue · NetCore
Receiving now
1
GRN-0442 · dock 2
Bills on hold
3
1 duplicate blocked
Supplier on-time
92%
+3 pt90 d
Items that are running low, with a suggested quantity to order from each supplier. Check the quantities (you can change them), tick the lines you want and click Create draft POs. Nothing is sent to a supplier from here.Start with red Cover (stock runs out in under 7 days). Draft POs then wait in Purchase orders for approval.

How suggestions are worked out · rule A17

Deterministic rule · ran 06:00 today · next run 06:00 tomorrow · 18 SKUs triggered · 2 excluded
Rule settings
triggerATP ≤ ROP · where ROP = avg/day × lead time + safety stock
suggestmax(0, avg/day × (lead + 7 d review) + safety − (ATP + on order))
roundup to supplier pack / MOQ · refurbished laptops in lots of 10
excludearchived · discontinued · supplier suspended · need covered by open PO
Human boundary: the rule only drafts. A buyer reviews quantities and sends; POs above approval thresholds also need a manager or owner.
Forecast-based quantities (A30) are a Phase 2 candidate and will still require buyer approval.
Costs are last PO cost ex-GST · quantities editable before drafting
0 lines selected·Nothing is sent to suppliers from here
ProductATP · ROPOn orderAvg/day · leadCoverSuggested qtyUnit costLine valueReason
Excluded: Seagate BarraCuda 1 TB (archived) · Apple AirPods Max refurbished (no supplier lot offered)
Every purchase order, from draft until it is fully received and closed. Click a PO to open it — the panel shows its steps and tells you what to do next. Use the stage bar to see only one stage.Work “Awaiting approval” and late deliveries (red date) first. A PO never changes stock by itself — stock goes up only when goods are received and pass QC.
Click a PO for details · closed POs from the last 30 days: 41
POSupplierLinesValue ex-GSTStatusApprovalExpectedReceived
Showing 10 recent POs of 55 in the last 90 days (sample) · click a pipeline stage to filter
Create a purchase order by hand — for example for a new product or a supplier offer that the reorder rule did not suggest. Choose the supplier and where to deliver, add lines with quantity and unit cost, then Submit for approval.The panel on the right shows who must approve it (by value) and any warnings to fix first. The supplier receives the PO only after it is approved and sent.

New purchase order · draft PO-2026-0196

Autosaved 10:44 · submitting twice returns the same PO (idempotent)
Draft

Lines

SKU · supplier codeQtyUnit costLast costLine total
Check a supplier's delivery in, against its purchase order. Pick the PO, scan every carton and serial number, record anything short, extra, wrong or damaged, then check each unit (QC) and post the goods receipt (GRN).Units are not sellable while you work. When you post, units that passed QC become sellable, failed ones go to quarantine, and anything unexpected is held for the buyer.

GRN-0442 · receiving against PO-2026-0188

Prime IT Distributors · delivery challan DC/PIT/8812 · invoice INV/PIT/2026/4502 · WH-BLR dock 2 · vehicle KA-01-AB-2231 · started 10:22 by Mohammed Irfan
Match PO
2 Count & scan serials
3 QC per unit
4 Post receipt
Next step: finish the count — 18 of 20 SSD serials are scanned and the other 2 did not arrive, so choose what happens to them under Handling in Lines on this delivery (backorder, cancel or wait for more cartons). Then set a QC result for every unit and post GRN-0442.

Scan log

    4 exceptions on this delivery — none can become sellable stock.
    • Duplicate serial PF3K9Z21 · unit held · case DSC-0034
    • 2 × Samsung T7 Shield sent instead of T7 · substitution needs buyer approval
    • 1 extra GaN charger (over-receipt) · held for buyer decision
    • ASUS ROG mouse not on PO · set aside for return

    Landed cost

    Allocated to unit cost for valuation & margin — never changes retail price
    Freight (VRL Logistics)₹3,200
    Transit insurance₹450
    Loading / unloading₹300
    Total to allocate₹3,950
    Allocation basis
    Effect: Samsung T7 1 TB +₹66/unit · USB-C adapter +₹18/unit · GaN charger +₹21/unit

    Lines on this delivery

    Quantities are posted only after QC · nothing reaches the website until units are sellable
    SKUOrderedBeforeReceiving nowSerialsVarianceHandling

    QC outcome per unit · SSD01-N

    18 units scanned · 16 pass · 2 fail · unit IDs assigned at receipt
    UnitManufacturer serialSealPhysicalSpeed testOutcomeResolution
    Showing 7 of 18 · passing units become sellable at WH-BLR on posting
    Ready to post GRN-04424 units held
    Posting creates receipt movements, moves 16 SSD + 20 adapters + 10 chargers to sellable, 2 SSD to quarantine, refreshes website availability (A04) and makes the supplier bill matchable.
    Supplier invoices (bills) checked before they are paid. Each bill is compared with its purchase order and goods receipt — the three-way match. Bills that agree within tolerance are approved for payment; the rest are held here for finance or the buyer.Open each bill on hold, read the difference, and decide: ask the supplier for a credit note, send it to the buyer, or approve it with a reason. Suspected duplicates are blocked until someone checks them.
    Matched & approved (30 d)
    38
    ₹1.12 Cr
    On hold · variance
    2
    price +₹1,440 · qty −2
    Duplicate suspected
    1
    blocked from payment
    Tolerance (sample)
    ±2% or ₹500 / line
    quantity must match exactly · tax must match

    Supplier bills

    A bill is payable only when PO, goods receipt and invoice agree within tolerance
    BillSupplier invoiceSupplierPO · GRNAmount incl. GSTMatchStatusDue

    BL-0331 · 3-way match detail

    INV/PIT/2026/4488 · PO-2026-0185 · GRN-0438 · Prime IT Distributors
    Price variance
    Line
    PO qty × price
    GRN qty
    Invoice qty × price
    Variance
    Result
    Intel Core i5-12400F CPU02-N
    40 × ₹8,640
    40
    40 × ₹8,640
    —
    ✓ Match
    Kingston FURY 16 GB RAM01-N
    60 × ₹2,284
    60
    60 × ₹2,308
    +₹1,440 (+1.1%)
    ✗ Over ₹500
    Logitech M190 MS03-N
    100 × ₹674
    100
    100 × ₹674
    —
    ✓ Match
    Taxable value
    ₹5,50,040
    ₹5,51,480
    +₹1,440
    GST (CGST 9% + SGST 9%)
    ₹99,007
    ₹99,266
    +₹259
    ✓ rate matches
    Prime IT's price list changed on 22 Sep (after the PO was approved on 19 Sep). Options: accept the variance with a reason (finance), or ask for a credit note of ₹1,699 incl. GST.
    Assigned: Deepa K. (Finance) · buyer Anita R. informed · due 29 Sep

    Duplicate invoice blocked · BL-0332

    Matched against bills from the last 12 months · normalised invoice numbers
    Blocked
    Field
    BL-0332 (new)
    BL-0318 (posted)
    Same?
    Supplier
    Prime IT (V-014)
    Prime IT (V-014)
    Yes
    Invoice no.
    INV-PIT-2026-4471
    INV/PIT/2026/4471
    Yes*
    Invoice date
    18 Sep 2026
    18 Sep 2026
    Yes
    Amount
    ₹2,14,380
    ₹2,14,380
    Yes
    Status
    Just recorded
    Paid 24 Sep · UTR HDFCR5202609241187
    * Numbers match after removing separators. Near matches (same amount ±1%, different number) are flagged for review, not blocked.
    How reliable each supplier is, and the terms Tradex buys on. The table compares delivery speed, on-time delivery, how much of each order arrives, and QC failures. The real lead time measured here is what the reorder rule uses.A supplier with a falling score or a stale stock feed is a reason to check open POs with them or order elsewhere. New suppliers are approved on the Vendors page before any PO.

    Suppliers

    Lead time used by the reorder rule is the 90-day actual, not the quoted figure
    Vendor onboarding
    SupplierGSTINStatusLead time
    quoted · actual
    On-timeFill rateQC failTermsOpen POsScore
    Scores combine on-time, fill rate, QC failures and invoice accuracy · vendors see only their own scorecard in the vendor portal

    Actual lead time · last 90 days

    Order sent → goods received · used by reorder rule A17

    Prime IT Distributors · terms

    V-014 · approved supplier since Apr 2024
    Price list valid to 31 Dec
    Account manager
    Naveen Gowda · +91 98450 1•••• · naveen@primeit.example
    Payment terms
    Net 30 from invoice · 1% early-payment discount (10 days)
    Bank account
    HDFC ••••4471 · verified (maker-checker) 02 Apr 2026
    Categories
    Laptops (new), monitors, components, storage, accessories
    MOQ / packs
    SSDs & RAM in packs of 10 · laptops per unit
    Returns (RTV)
    DOA within 7 days → replacement; QC fail → credit note in 15 days
    Feed